KeNHA Announces Two-Month Road Closure, Reveals Alternative Routes for Nairobi Motorists

Written by

in

The temporary closure will take effect on Wednesday, December 2, 2026, to allow contractors to reconstruct the interchange's ramps, loops and slip roads.

In a public notice issued on Wednesday, November 25, KeNHA said the construction works would require the closure of several access points, prompting motorists to use alternative routes when travelling between Nairobi, Ndumbuini, Uthiru and surrounding areas.

The project is intended to improve traffic movement and road safety along the busy corridor, particularly at points where vehicles enter, exit and change direction.

However, the authority's published notice contains an apparent date error, listing January 31, 2026, as the completion date despite the works beginning in December 2026. The correct year should be confirmed with KeNHA before publication.

The affected corridor connects several residential areas and routes serving motorists travelling along Waiyaki Way towards Uthiru, Ndumbuini and other parts of Nairobi's western outskirts.

The road section has also attracted safety concerns from residents, particularly around Kamutiini, King'eero, Lower Kabete Road and Uthiru Bridge.

Some of the concerns raised include inadequate pedestrian footpaths, faded road markings, speeding vehicles and the heavy presence of public service vehicles.

The planned reconstruction is expected to improve how vehicles join and leave the main highway.

The ramps and slip roads will provide designated entry and exit points, helping reduce dangerous merging, sudden braking and unnecessary turning movements.

Loop ramps are also designed to allow vehicles to change direction without making risky turns across opposing traffic.

However, pedestrian facilities, visible road markings and appropriate speed limits will remain important in ensuring the upgraded interchange serves all road users safely.

Alternative routes for motorists

KeNHA has outlined several alternative routes to help motorists navigate the affected section during construction.

Drivers travelling from Nairobi towards Ndumbuini can exit at Kabete Technical along Waiyaki Way and proceed towards Naivasha Road Roundabout.

They should then use the Uthiru Underpass, turn back onto the Nairobi-bound carriageway and access Marigioni Cabro Road, which leads towards Ndumbuini Shopping Centre.

Another option is to exit at Leadway Petrol Station, proceed to the Uthiru Underpass and rejoin the Nairobi-bound carriageway before taking Marigioni Cabro Road.

Motorists can also use the 87/Muhuri Interchange, shortly after Shell Kinoo, and proceed along 87-Ndumbuini Road near 87 Mall.

For drivers approaching from Rironi and Nakuru, KeNHA has directed them to turn at Muhuri Interchange and use Muhuri-Ndumbuini Road to reach their destinations.

Those travelling from Ndumbuini towards Nairobi can use Marigioni Cabro Road or Ndumbuini Road through the 87/Muhuri Interchange to access Waiyaki Way.

Motorists heading towards Rironi should use the Nakuru-bound carriageway.

KeNHA has urged motorists to follow the temporary traffic management arrangements, observe road signs and exercise caution around construction zones to minimise delays and avoid accidents.

Source

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *