Motorists using the Lower Kabete-Ndumbuini/Kapenguria Road-Uthiru Road Interchange are facing imminent travel delays following an announcement of temporary traffic disruptions starting early next month.
The Kenya National Highways Authority (KeNHA) revealed that the disruption is due to scheduled road works aimed at reconstructing the interchange ramps, loops, and slip roads.
"The Kenya National Highways Authority would like to inform the public of a temporary traffic disruption following closure of Lower Kabete-Ndumbuini/Kapenguria Road – Uthiru Interchange," KeNHA Director General Luka Kimeli said.
According to the notice, the closure will commence on Wednesday, December 2, 2026, and run through Sunday, January 31, 2027.
To minimize inconvenience, the highway authority has outlined several alternative routes for affected motorists based on their travel destinations.
Motorists traveling from the Waiyaki Way to Ndumbuini can use the Kabete Technical Exit to reach Naivasha Road roundabout and proceed through the Uthiru Underpass before connecting back to the Nairobi-bound carriageway and utilizing the Marigoini Cabro Road.
Alternatively, motorists can exit at the Leadway petrol station to the Uthiru Underpass, join the Marigoini Cabro Road, or proceed to the 87/Muhuri Interchange after 87 Mall to access the 87-Ndumbuini Road.
For commuters traveling from Rironi/Nakuru towards Ndumbuini, traffic will turn at the Muhuri Interchange and navigate via the Muhuri to Ndumbuini Road.
Drivers heading from Ndumbuini to the Waiyaki Way carriageway can either take the Marigoini Cabro Road to reach the Nairobi-bound lane or use the Ndumbuini Road – 87/Muhuri Interchange to connect to either the A8 Nairobi-bound or Nakuru-bound carriageways.
Meanwhile, traffic moving between Uthiru/Kawangware and Naivasha Road will be diverted to use the Uthiru Underpass or the Muhuri Interchange for all turning maneuvers.
KeNHA has called upon road users to strictly observe safety protocols throughout the construction period to ensure smooth transit.
"KeNHA advises motorists to follow the traffic management plan, project road signs and co-operate with police and traffic marshals on site," Kimeli added.

Leave a Reply