Kenya Pipeline Company (KPC) was on Monday forced to shut down a section of Line 5, its Mombasa-Nairobi petroleum artery, after the pipeline was punctured during third-party works near Tassia, off Outer Ring Road, in Embakasi Central Sub-County.The incident occurred at about 9:00am on Monday on Line 5, which carries petroleum products from Mombasa to Nairobi.
KPC shuts Line 5 after contractor punctures pipeline in Embakasi, Nairobi

Leave a Reply