KPC shuts Line 5 after contractor punctures pipeline in Embakasi, Nairobi

Written by

in

thumbnail

Kenya Pipeline Company (KPC) was on Monday forced to shut down a section of Line 5, its Mombasa-Nairobi petroleum artery, after the pipeline was punctured during third-party works near Tassia, off Outer Ring Road, in Embakasi Central Sub-County.The incident occurred at about 9:00am on Monday on Line 5, which carries petroleum products from Mombasa to Nairobi.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *