(Photo courtesy)
Motorists using Gitanga Road in Kawangware, Nairobi, will have to make alternative travel arrangements after the Kenya Urban Roads Authority (KURA) announced a partial road closure starting Thursday, November 26, 2026.
In a public notice issued on Thursday, November 19, KURA said a 100-metre section of the road, between Km 0+520 and Km 0+620, would be closed to allow construction of a cross culvert.
The closure will take effect at 6:00 AM on November 26 and remain in place until 6:00 PM on Saturday, December 5.
According to the authority, the construction is intended to improve drainage, allow water to flow properly and reduce flooding along the affected section of Gitanga Road.
During the ten-day period, motorists heading towards Kawangware will be diverted through Macharia Road, while those travelling towards Nairobi or seeking local access will be required to use Naivasha Road.
KURA has also directed heavy vehicles and Public Service Vehicles (PSVs) weighing more than 7.5 tonnes to use Naivasha Road throughout the closure period.
Pedestrians will still have access through an open walkway, while traffic marshals will be stationed at the barricades to guide motorists and manage traffic along the diversion routes.
The roadworks come at a time when Nairobi and other parts of the country are experiencing heavy rainfall.
The Kenya Meteorological Service has warned of continued rainfall through November, raising concerns about flash floods, flooding and possible transport disruptions.
Gitanga Road is an important route for residents of Kawangware, Riruta and Kabiria travelling towards Lavington, Kilimani and Westlands.
The temporary closure is therefore expected to affect daily commuters, particularly during morning and evening rush hours, when traffic around Valley Arcade and Lavington is usually heavy.
Motorists have been urged to follow the announced diversions and cooperate with traffic marshals to ensure smooth movement during the construction period.
https://www.kenyans.co.ke/news/129522-kura-announces-10-day-partial-closure-gitanga-road

Leave a Reply