KeNHA Announces Two-Month Road Closure at Lower Kabete Interchange, Reveals Alternative Routes

Written by

in

In a public notice issued on Wednesday, November 25, KeNHA Director General Luka Kimeli said the temporary closure would take effect on Wednesday, December 2, 2026, and remain in place until Sunday, January 31, 2027.

The planned works will involve reconstructing the interchange ramps, loops and slip roads, requiring changes to normal traffic movement around the affected section.

KeNHA has consequently published alternative routes for motorists travelling between Waiyaki Way, Ndumbuini, Uthiru, Kawangware and the Nairobi-Nakuru highway.

Drivers travelling from Waiyaki Way towards Ndumbuini can use the Kabete Technical exit, proceed to the Naivasha Road roundabout and pass through the Uthiru Underpass.

They can then reconnect with the Nairobi-bound carriageway and use Marigoini Cabro Road to reach their destination.

Another option is to exit near Leadway Petrol Station and proceed through the Uthiru Underpass before joining Marigoini Cabro Road.

Motorists can also continue towards the 87/Muhuri Interchange, located beyond 87 Mall, and access the 87-Ndumbuini Road.

For drivers approaching from Rironi and Nakuru and heading towards Ndumbuini, KeNHA has directed traffic to turn at the Muhuri Interchange before using the Muhuri-Ndumbuini Road.

Motorists travelling from Ndumbuini towards Waiyaki Way will have two alternatives. They can use Marigoini Cabro Road to access the Nairobi-bound carriageway or take Ndumbuini Road towards the 87/Muhuri Interchange.

The latter option will allow them to connect to either the Nairobi-bound or Nakuru-bound carriageway along the A8 highway, depending on their destination.

Meanwhile, motorists travelling between Uthiru, Kawangware and Naivasha Road will be required to use the Uthiru Underpass or Muhuri Interchange when making turns.

KeNHA has urged motorists to familiarise themselves with the temporary traffic arrangements before travelling through the area to avoid unnecessary delays.

Kimeli also asked road users to observe all project signs, cooperate with police officers and follow instructions from traffic marshals deployed at the construction site.

The changes are expected to affect motorists who regularly use the interchange to connect to neighbouring residential areas and major roads during the festive season and the opening weeks of 2027.

Source

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *