KeNHA Announces Major Road Closure in Nairobi, Lists Alternative Routes for Motorists

Written by

in

The Kenya National Highways Authority (KeNHA) announced that the interchange would be temporarily closed from Wednesday, December 2, 2026, to allow contractors to rebuild its ramps, loops and slip roads.

In a notice issued on Wednesday, November 25, the authority warned that the construction would affect motorists travelling between Waiyaki Way, Ndumbuini, Uthiru and surrounding areas.

To minimise inconvenience, KeNHA published alternative routes for different categories of road users.

Motorists travelling from Nairobi towards Ndumbuini will have three options. They can exit at Kabete Technical along Waiyaki Way, proceed to Naivasha Road roundabout and use the Uthiru Underpass before accessing Marigioni Cabro Road.

Another option involves exiting at Lead Way Petrol Station and following the same route through the Uthiru Underpass.

Alternatively, drivers can proceed beyond Shell Kinoo to the 87/Muhuri Interchange and access the 87-Ndumbuini Road near 87 Mall.

Those approaching from Rironi and Nakuru have been advised to turn at Muhuri Interchange and use Muhuri-Ndumbuini Road.

For motorists heading from Ndumbuini towards Waiyaki Way, KeNHA has provided two alternatives: using Marigioni Cabro Road or Ndumbuini Road to connect through the 87/Muhuri Interchange.

Traffic from Uthiru and Kawangware will also be affected, with motorists required to use either the Uthiru Underpass or Muhuri Interchange when making turns to and from Naivasha Road.

KeNHA Acting Director General Luka Kimeli urged motorists to follow the designated diversions, obey road signs and cooperate with traffic police and marshals.

The announcement comes days after the Kenya Urban Roads Authority announced partial closure of Gitanga Road in Kawangware from November 26 to December 5, 2026, to facilitate drainage improvement works.

Note: KeNHA's notice contains a date inconsistency, referring to the closure ending on January 31, 2026, despite the works beginning in December 2026. Motorists should confirm the correct reopening date with the authority.

https://nairobileo.co.ke/news/article/31690/kenha-announces-temporary-closure-of-lower-kabete-uthiru-interchange

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *