KURA to Partially Close Sections of Gitanga Road in Kawangware From November 26

Written by

in

The closure begins at 6 am on November 26 and runs until 6 pm on Saturday, December 5, 2026, both days inclusive, according to reports of the notice.

KURA said the closure will allow the safe construction of a cross culvert to improve drainage along the road, Eastleigh Voice reported.

.ke reported that the affected stretch is 100 metres long, between Km 0+520 and Km 0+620.

Motorists travelling toward Kawangware will be diverted through Macharia Road, according to Kenyans.co.ke. Those heading to Nairobi or needing local access will use Naivasha Road, the outlet reported.

The Kenya Times reported that drivers coming from the Nairobi side toward Kawangware will be diverted through Macharia Road before joining Salim Road.

Heavy vehicles and PSVs above 7.5 tonnes have been directed to use Naivasha Road throughout the closure, according to Kenyans.co.ke.

According to Kenyans.co.ke, residents of Kawangware, Riruta and Kabiria use the road daily to reach Lavington, Kilimani and Westlands. The outlet said the culvert is expected to improve water flow and ease flooding along the stretch.

Kenya Today reported that the work is aimed at reducing flooding during the short-rains season.

KURA’s notice also refers to a diversion sketch showing alternative routes, according to Uzalendo News.

The road is scheduled to reopen at 6 pm on December 5, Eastleigh Voice reported.

The reports reviewed did not give the cost of the works or name the contractor. https://www.facebook.com/share/p/19uu3j9w7T/

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *