Gitanga Road Section Shuts For Ten Days As Kawangware Drivers Face Major Detour

Written by

in

Motorists using Gitanga Road in Kawangware will soon need a new plan for their daily trips. The Kenya Urban Roads Authority has announced a partial closure of the road for ten days starting Thursday, November 26, 2026.

The affected stretch runs between Km 0+520 and Km 0+620. That is a 100-metre section of a very busy road. It will stay closed from 6 AM on the first day until 6 PM on Saturday, December 5, 2026. Both dates are included.

KURA says the closure will allow safe construction of a cross culvert. The authority says the structure will improve drainage along the road corridor. It is also expected to ease the flooding that often troubles this area.

The timing is important. The country is in the middle of the October to December short rains season. The Kenya Meteorological Service Authority has forecast continued heavy rainfall through November. It has warned of flash floods and landslides in several counties including Nairobi, Kiambu and Machakos.

Gitanga Road is normally packed during weekday morning and evening rush hours. Traffic is especially heavy near Valley Arcade and Lavington. Schools like Braeburn, nearby offices and shopping areas add to the pressure. Residents of Kawangware, Riruta and Kabiria depend on it daily to reach Lavington, Kilimani and Westlands.

Diversions have been planned to keep vehicles moving. Motorists heading toward Kawangware will be directed through Macharia Road. Those going toward Nairobi or needing local access will use Naivasha Road as their main alternative.

Heavy vehicles and PSVs above 7.5 tonnes must use Naivasha Road throughout the closure. A pedestrian walkway will remain open for people on foot. Traffic marshals will guide drivers at barricades along the diversion points.

https://x.com/kenyans/status/2123394139844911238?a=-SuV4hsX8jeloWgKh_4&s=46

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *