Nairobi motorists using Gitanga Road should prepare for significant traffic changes next week after the Kenya Urban Roads Authority (KURA) announced a 10-day partial closure of a busy section in Kawangware.
The temporary restriction is expected to affect thousands of commuters, private motorists and public transport operators who rely on the road for their daily journeys.
According to a public notice issued by KURA, the affected section stretches between kilometre 0+520 and kilometre 0+620. The closure will take effect on Thursday, November 26, 2026, at 6am and remain in force until Saturday, December 5, at 6pm.
The authority explained that the temporary closure is necessary to facilitate the construction of a cross culvert aimed at improving drainage and strengthening the road infrastructure.
Although the works are expected to cause temporary inconvenience, the improved drainage system is intended to support the road's long-term durability and reduce drainage-related challenges.
Here are the diversion routes motorists should know.
KURA has developed different traffic arrangements depending on the category of vehicle to minimise congestion and ensure motorists can access their destinations.
Private motorists heading towards Kawangware have been advised to use Naivasha Road, which connects to an alternative route leading back to Gitanga Road.
Those travelling towards Nairobi or seeking local access should use Salim Road through Macharia Road before rejoining Gitanga Road towards the city centre.
However, public service vehicles and heavy commercial vehicles weighing more than 7.5 tonnes will be required to use the designated Naivasha Road diversion. These vehicles will not be permitted to use the alternative routes reserved for private motorists.
The authority has also confirmed that pedestrian access will remain open throughout the construction period, allowing people to continue moving through the affected area.
Traffic marshals and flagmen will be deployed at strategic intersections to guide motorists and help maintain orderly traffic movement.
The affected section is particularly sensitive because it serves a busy commercial area near Kawangware Open-Air Market, where traders, shoppers and pedestrians frequently interact with motorists.
KURA has urged road users to obey temporary traffic signs, follow instructions from traffic police and allow additional time for their journeys.
The authority has apologised for the inconvenience, saying the temporary disruption is part of efforts to improve Nairobi's road infrastructure.
Source

Leave a Reply